Sunday, April 10, 2011
Faux Tin Tile Ceiling Reveal!
Saturday, March 26, 2011
From 78 to 30
I've been painting in the kitchen/dining room all day - I'll share pictures of what I've been up to either later today or tomorrow. Mom bought me a new gadget today and brought it over. A red tea infuser to match my red themed kitchen, isn't it cute!
Tuesday, March 22, 2011
I'm BACK!
After Christmas it felt like I was at a basketball game 3-4 times a week, wait a minute I WAS at basketball games 3-4 times a week. I made custom storyboards in different sizes for each of the 8th grade boys that their parents presented them on the last home game. I also made an album for the coach that the boys presented to him that same night. Once junior high ball ended I was at the high school games and then volleyball began. Volleyball ended last night, track practice started yesterday with the first meet in 2 weeks - it never ends!
One weekend toward the end of basketball I had a 3 hour session with the junior high cheerleaders, it was a lot of fun. The junior high boys won regional and competed in state (didn't place but we're still proud of them) and the junior high cheerleaders also competed at their state (6th place but deserved 2nd at the very least in my opinion). I had a fun weekend in Springfield watching the cheerleaders, reliving high school memories.
I was hired by a couple other schools to shoot some of their sporting events - that's exciting! I didn't intend to become a sports photographer but always loved participating and attending sporting events of all types plus I understand the rules and flow of the events for the most part which I think is necessary to capture good sports pictures.
In addition I've done several newborns, toddlers and a few family sessions. I've also shot 2 birthday parties (80 & 90 year old folks) with extended family group pic's. So that's what I've been up to the last 2-3 months.......sports and pictures.
On the house renovation:
I'm having a love/hate relationship with red paint. I can't get it on without showing brush strokes and I've painted many a room, inexperience isn't the issue. I purchased an additive a few days ago on a friends recommendation that's suppose to reduce/eliminate brush strokes from showing. Repainting again this weekend and will let you know.
I'm 75% done with my kitchen/dining room ceiling! WooHoo!! I only restarted it 5 times, Sunday I tore half of what I had done down and kept going until I was done with that part of it (my neck and shoulders weren't happy with me Monday morning). Tonight I'm going to buy the cabinets & supplies necessary to build my kitchen island. Tomorrow Michael is coming over to move my light (it's about a foot off from being centered over the island which will bug the heck out of me if I don't get moved). Once he moves the light I can do the last step of the ceiling and it will be DONE.
I'm also purchasing the crown molding tonight. Hope to find time this weekend to at least get it painted and maybe hung next week if I get the red paint to cooperate.
Once the ceiling & walls are done and the island is semi built, I can finally lay my kitchen floor. Am I ever ready to have an actual floor and not a wood sub-floor. The only major thing remaining in the kitchen/dining room is the deck door (it's a window right now). I still have to find the one I want at a price I'm willing to pay. It'll be a May/June project.
I still need to remove the bottom cabinet doors (again), sand them this time and repaint them. I also need to paint the shadow box area by the ceiling - I'll have to show you a picture to explain it. I think I've narrowed down my fabric for curtains.
Hopefully by Easter I can start to decorate this area - hopefully.
I think that's enough of a 'catching-up' post for now.
Sunday, December 12, 2010
Snow, Fireplace and Christmas Decorations
and I brought some corn for poppin'
and since we've no place to go (tadada)
Let it Snow
Let it Snow
LET IT SNOW
Sunday morning here in SoIL and we finally have our first SNOW! I love the snow!
I really need to be at work today since I have a board meeting tomorrow in which I was given the shortest amount of time possible to get the financials done and then on top of it have to forecast the rest of the year to determine bonus checks. But instead I think I'll sit at home in front of my fireplace and enjoy the scenery. Big thanks to Dad for getting firewood out of the woods out back and starting a fire yesterday while I was at a photo session.
My thermostat is set on 60 and didn't kick on until around 6:30 this morning. Of course I didn't carry wood in last night and had to treck out in the snow early this morning to keep the fire going - well worth it though, I love the feel and smell of wood burning.
Oh forgot to mention, I am officially living in my house now!!
Moved in the day my first house guests arrived (day before Thanksgiving), well truth be told I had to pack an overnight bag with clothes in it after my house guests were here because I only had enough moved for it to be liveable (didn't get around to clothes) and it rained that entire week.
I'm not ready to show you pictures yet as NO room in my house is done. I've been super duper busy this fall with pictures and have worked 60 hours plus the last two weeks and expect about that many hours this week too so 'things' at the house have been put off. But on a good note, come Thursday afternoon......I'm on vacation until the new year! That vacation isn't going to be a relaxing time but rather a "I'm getting stuff done at the house" vacation. I"ll relax some, but I'm ready to get a few projects marked off as complete. I won't really be able to relax until I get things done.
On the agenda for Christmas break:
*build kitchen island
*faux tin tile ceiling in kitchen
*molding on kitchen shadow boxes
*lay flooring in kitchen
*seal basement floor
*paint basement walls
*maybe build a few shelves in basement
*do a funky treatment on north wall in living room (knocking it out in spring so as of right now it's totally unfinished and ugly - have an idea on cheap treatment to mask look until remodel)
*hang blinds and window treatments in bedrooms and kitchen
*fix paint on kitchen cabinet doors
*hopefully get my handy-men to finish the tile in my bathroom, run electrical hookups to rest of outlets and move my satelitte connection
*re-arrange living room
*lay flooring in closet
*get bed set-up and bedroom put together (matress is on the floor right now), the room is painted but that's about all I can say about it
*maybe if I have time and weather permits, get crown molding installed in two bathrooms
I think that sounds like enough work for a vacation. Here are a few of my Christmas ornaments......well, it's time for me to design a few photo albums and then start working on company financials spreadsheets so I don't have to go into work at 3am tomorrow morning to get them done in time!
Thursday, November 4, 2010
Quick Update....
Clean, clean, CLEAN
Prime and Paint - the entire house
Install my fridge, microwave and stove
Apply the back splash in the kitchen
Get all the light fixtures installed
Tile the shower in both bathrooms
Install the stool and sink cabinets in both bathrooms
Install the kitchen/dining room ceiling - excited about this can't wait to share pics
Clean, clean, CLEAN some more
Wash all my dishes and put them in the cabinets
Remove the last of the carpeting and try to clean the hard wood (sanding it in the spring) - any suggests to remove carpet/padding marks without sanding are appreciated
Clean out the fireplace and haul a couple loads of wood - starting to get cool here
and then start MOVING IN!!
Time left before my first house guest arrives: 20 days
In that time I also have to get 5 more sessions already shot edited (one of which is a wedding with LOTS of pictures), attend and take a few pic's of a friends wedding next week, 7 photo sessions to shoot(which of course all need to be edited for possible Christmas gifts) and I'm decorating a wedding Nov 20th with fresh flower arrangements- only 40 tables, no biggie! Plus basketball has begun so I 'have' to attempt to attend as many games as possible every Tuesday and Thursday night.
This post isn't meant as a complaint in any way, shape or form - I'm LOVING life!
Thursday, October 28, 2010
Ceiling Work!
The only room that still has these tiles is the mudroom. It's a winter/cold weather day project so they'll stay up there for a few months or so. I need to get the actual living space in working condition before I tackle this room.
I've received some strange looks and comments on leaving the ceiling the natural wood and not covering it up. I think it'll give it a rustic look. I may hate it in the long run but want to give it a try and besides, what's it going to hurt to put a layer of varnish on my ceiling?
Tuesday, October 19, 2010
Bathroom Tile

I'm not sure I'll have time to tile the bathroom next week but everything else should be complete. Before and after pictures of this room coming soon.
House Update: Week 22
Good News! I hired my Uncle yesterday to help my brother/dad with the remodel - upgrade. My cousin called and told me she's definitely coming for Thanksgiving so I now have a deadline to be in a 'live-able' home with house guests! Figured an extra set of hands was needed to achieve this new goal.
So here's where we're at:
1) Most demolition has been completed.
2) My new bathroom has walls, electrical ran, plumbing installed, light fixture installed, tub installed, pocket door installed, walls mudded and waiting to be sanded. My sink, vanity and stool are there ready to be installed as soon as the walls are sanded and I get to prime & paint. I need to purchase tile for my tub surround and get that tiled. Then I'll just need to 'decorate' it - woo hoo it's almost done.
3) My new closet has walls with sheet rock on the inside, walls are mudded waiting to be sanded. Electrical is ran along with a light fixture. Once the room is sanded I'll prime & paint it. We still need to hang the door and install hardwood flooring which I still need to pick up.
4) Guest room closet has the 2x4 frame but no sheet rock. I need to determine what kind and size door I want on this and go get it.
5) Two bedrooms need sheetrock on the hall between them and the doors hung. Both rooms need the cracks in the ceiling filled with caulk, lightly sanded and varnished - leaving them the pine wood. Both also need a couple coats of new paint, floors sanded and sealed, and window treatments.
6) Demolition of the existing bathroom is 'in progress'. Cast iron tub should be moved to it's new home in the guest bathroom today! Guest bathroom has had nothing done yet. So it still needs the framing, sheetrock, electrical, plumbing, painting, and fixtures - it's just an empty space in the living room right now.
7) Kitchen: I've painted the cabinets, they're pretty much ready to go. Old bedroom wall has been removed along with the ugly ceiling tiles. New outlets have been installed along with a gas line for my stove. Carpet should be coming up & out of there early next week - YAY. We have to lay a thin subfloor over the existing tile before I can install the new flooring. A new back door has been cut, the old doorway needs to be framed out then we can sheetrock the walls and ceiling, mud, sand, prime, paint, install laminate floor, and move in the appliances! I've purchased new cabinets for between the stove and fridge but need to still get a few more for my island. I want to replace the dining room window with a door that will eventually lead to a back deck too.
8) Living Room: not much has happened here. It'll kind of be in limbo, don't want to put much into it until next spring when the front door gets moved. The ugly ceiling tiles have been removed though and the carpet in this room will also come out sometime next week! This room has beautiful oak hardwood floors hiding under the carpet. The ceiling and south wall will have sheet rock hung, mudded and sanded soon too.
9) Utility Room is where the existing bathroom is, so it's waiting for bathroom demolition to happen. A washer and dryer were left in the house and are hooked up somewhere else so the utility room can technically wait until after the holidays.
10) Mudroom: nothing has been done. It'll be a project for the cold winter months with nothing to do. Plan to paint the existing paneling and paint the cement floor, new window treatments and maybe a few shelving units and some cool hooks.
11) Basement: nothing has been done (except for me piling up loads of 'stuff'). Need to get everything out that I've carried down there and seal the floors (course in reality I'll just move it to one side, paint, and then move it to the other side). I hope to get lots of electrical boxes ran down here soon cause I NEED them! I'm going to paint the walls (probably different colors in different areas) and partition off areas of the basement: photo area, scrapbooking area, wedding prep area, and general storage. Too bad there's a monster furnace in the middle of the room! Eventually I'll get some type of storage going - shelves and/or cabinets. Also need to move the light switch and build the stairwell wall up to the ceiling - kind of has more to do more with the mudroom.
12) Doesn't have anything to do with the remodel but I need to get firewood gathered from the woods. Sounds like a good job for Johnathon and I! Temps have started falling into the 40's at night so here real soon I'll have to get a gas tank too :)
My dad and brother were making steady progress, but I think an extra knowledgeable person will make a huge difference. Excited to see what was accomplished today when I go home tonight!
Tuesday, October 5, 2010
In a People House

"Come inside, Mr. Bird," said the Mouse.
"I'll show you what there is in a people house...."
While this wasn't my favorite Dr. Seuss book, it was Michael's and I read it to him over and over and over. Sunday Johnathon and I were unloading wedding decorations from the night before, carrying some stuff inside while other boxes were unloaded to the garage.
Johnathon came running out of my house with big wild eyes telling me there was a bird in my kitchen! I finish dealing with what ever I was unpacking and went inside to check it out.....he was right, there was a little chickadee in my house.
Johnathon and I attempted for a few minutes to direct it out the front door - unsuccessfully of course. So I went home and got reinforcements. I'm glad there wasn't a hidden camera in my house as dad, Johnathon, John Greyson and myself got the bird out of the people house. Then again a video would have been comical to watch!
The bird made it safely out and "In a People House" still isn't one of my favorite books (come on, it's about a bird and mouse running through your house)!
Tuesday, August 3, 2010
House Update: Week 7
I learned the hard way that I 'DID' need to sand my base cabinets. When we put the doors back on, one stuck and when I opened it paint peeled off. So the cabinet doors are once again off and we've started peeling off paint and sanding the bases. It was kind of one step forward, two steps back. Better to find out now before the cabinets are full and everything else is done in the kitchen - less mess this way.
My bathroom & closets are waiting on plumbing, electrical work and sheet rock. Unfortunately it's been way too hot to climb into the attic to do electrical work and my brother and I have both been too busy to help dad with the plumbing/sheet rock.
Thankfully baseball/softball for the summer has ended! I've done about 10 photo sessions since the end of ball season with about that many booked in the near future. I've also decorated a several weddings and have one more wedding this month along with a 55th anniversary party. This past weekend I did floral arrangements for 30 tables (with 6-8 candles on each table too) along with 14 bouquets & 2 corsages and delivered it all to the Chase Park Plaza in St. Louis. That was the first wedding which I traveled that far to. It went great - of course I didn't get pictures to prove it! Side note, I had to rent a cargo van to get everything there and am very thankful that I did - Arielle and I would have never got all that stuff into two cars.
This week we're to have record temps, in the 3 digits with heat index's of 115 to 120 degrees and I HAVE to get pictures edited. Those two factors mean that not much will get accomplished this week on the house. By September the temps should be decent again and once we get started on what's left it should go pretty quickly. Still shooting to be in by Halloween!
Saturday, July 17, 2010
Found a Treasure
Dad found this in the ceiling of the little hallway between the kitchen and bedroom(the one I'm making a dining room).It almost fell on his head as he was taking down the paneling ceiling.
A little elbow grease and a new shade and it'll look good as new! Can't wait to display it in my completed kitchen.
Friday, July 16, 2010
But why can't I sand it.....

Dad had started tearing out the shelf unit between the living room and kitchen that I want to be an open area - no walls / no shelf unit / no beams. When he had most of it torn down he realized that the beam the framed the doorway was a support beam - bad news for me - and that the beam/joice it's supporting in the ceiling is bowing - more bad news for me. After Danny explained to dad how to build a support, jack wall and replace the joice I asked him about the ceiling.
Dad had removed the ugly tiles in the kitchen & dining room per my request. I was happy to find that there was an old slat ceiling in there but unfortunately they'd covered it with felt and layers of wallpaper (yeah for me, more wall paper!!)
and into our conversation.....
Me: Any suggestions on the best way to get the wallpaper off the ceiling and lightly sand the slats?
Danny: You don't
Me: Yah, I want to sand the slats and whitewash them - it'll look cool - I saw it on a blog
Danny: Then put up new slats
Me: Don't want to buy new ones, how do I clean these
Danny: You don't, either buy new slats or put up sheet rock
Me: Don't want to do that, what's wrong with these?
Danny: By the looks of them they're from the original house
Me: I know, that's what I like about them
Danny: Understand, but you don't know what's on them. You don't know what they treated them with a hundred years ago or what they used to put up the felt or what type of adhesive was used for the paper. Good chance there's something up there you don't want to stir up. I understand the concept of what you want to do and if you want painted slats you need to put new wood slats on top of the existing.
Me: Seriously. Well that's not the answer I was looking for.
So, now I have a ceiling without ugly white tile but with felt and wallpaper half attached in most places on old dark brown slats (that would look sooooo cool whitewashed by the way) that I'm told I can't touch and need to cover with something........any suggestions? Since I did ask his professional opinion I guess I'll listen to the advice and leave the old stuff up there alone (secretly protesting that decision though). I'm thinking I'll probably go back to the tin tile ceiling look for the kitchen & dining room.
On a good note - Dad started framing out my bathroom yesterday! Isn't that wallpaper lovely. It's one of the 4 layers on the slat boards that was under the sheet rock I/dad knocked down.
Monday, July 12, 2010
House Update: Week 3 & 4 combined
1) The wall & closet between the kitchen and what I'm making into a dining room has been torn down thanks to dad. You can see the wall behind the custom build shelf unit between the kitchen and living room (this shelf will be coming down in the near future too). I was surprised to find dry wall under the paneling - why would you put up that green paneling?? Anyway, that's the wall that was removed as you'll see the progress in the next two pics.
As you can see above the wall is GONE!!2.) The walls in the old bedroom (that you can see in the picture above have wallpaper on them - no big deal, right? Wrong, after who knows how many hours and use of a professional steamer......I knocked down one of the walls! It will be so much cheaper and easier to just put up new sheet rock. Why I wasted so many hours trying to remove the 4 layers of old, old paper is beyond me. The back wall shown above now has a door cut out - part of this room will be the master bath and the other half will be the dining room. The window you see will eventually become a door leading onto a deck out back.
3.) My cabinets are almost completely painted. I've trimmed one side (didn't have enough to get the other side completely done). Once I get the other side trimmed, I'll paint the trim and then work on the back splash. My new drawer pulls came in Saturday, so installing them and putting the cabinets 'back together' will complete that part of the remodel. Below is a pic before the trim.
4.) I've determined that I really don't like the ceiling tiles currently in the house and have found that the entire house has the old slat ceiling. Pretty sure the tiles will be removed and the slats sanded and white washed. Can't wait to start on that - should be a huge improvement.
Dad also took the top boards off the built in shelf between the living room and kitchen to make sure the post wasn't load-bearing and it's not!! So I'll be able to have that 12 foot area between the two rooms open.
I've decided that several of the things that I was going to wait and do once I moved in I'll probably go ahead and do now. Since everything's all tore up I might as well do it all at once instead of starting a project and leaving 1 or 2 things undone until a later date and then making a huge mess once furniture and my belongs are in place.
My move in goal is Halloween.....we'll see how it goes!
Left to do in the kitchen / dining room:
1.) Finish trim, finish painting cabinets and top cubby hole.
2.) Install hardware and re-hang doors
3.) Backsplash - faux silver tin
4.) Finish the removal of the custom built shelf between living room & kitchen
5.) Remove ceiling tiles, sand & white wash planks
6.) Remove carpet in kitchen
7.) Hope to remove floor tiles under kitchen carpet glued directly onto oak hardwood floors
8.) Frame and dry wall my bathroom (1/2 floor space of old bedroom/dining room area)
9.) Remove window and cut frame for patio door
10.) Cut frame for new back door (leading to mudroom/basement)
11.) Fill in old backdoor with dry wall
12.) Mud & sand all dry wall
13.) Paint
14.) Have floors sanded and refinished
15.) Install new floor and wall cabinets between stove & fridge
16.) Build/install kitchen island
17.) Hang new lighting in the kitchen & dining room
18.) Install all floor & ceiling trim
19.) Move in kitchen 'stuff'
Sunday, June 27, 2010
House Update: Week 2
I hope everyone has a great week. I can't wait for it to be Friday so I can work on my house again!
Tuesday, June 22, 2010
House Update: Week 1
1) carpet removed from bedroom/future dining room
2) closet & wall between kitchen and bedroom is GONE (Dad did this - he's decided he's good at tearing things up!)
3) kitchen cabinets have 1+ coats of paint (still working on the doors & drawers - ran out of paint)
4) sliding glass door between the sun room/entry and living room is gone - very odd spot for a door, not sure why they had it there
5) garage was sprayed out with the power washer (needs done again at least once - still a strong smell of oil - previous owner worked on garden tractors/lawn mowers and wasn't real neat about spillage of oil)
6) closet and 1/2 bathroom between 2 bedrooms has been demolished down to the studs
7) new kitchen faucet installed
8) new fridge made it safely inside the house
I know I should have pictures but they're at home and I'm not! I'll try to get a Part 2 to this post tonight with pictures of the progress. Plus we still have 2 & 1/2 weeks left of summer ball. I have tons of pictures to get edited & posted from ball season this year and a wedding to decorate and photograph this weekend, plus four other sessions to get edited......UGH, I think I need a vacation!
Since every post 'should' have a picture, here are a few from a bridal shower I shoot several weeks back. You can see more on my PHOTOGRAPHY BLOG!.
Super cute favors - note pads and pink or orange Sharpies
Part of the foods spread (all prepared by her parents)