As of today I've owned my home for 4 weeks - can't believe it's been that long. In that time I've come to a realization (after another, after another!), the more you do to the home......the more you find to do to the home. Once we started tearing this and that out, the more I wanted to tear out. Which isn't speeding up my timeline to move in....


So as of right now - nothing is complete and more has been destroyed (intentionally of course). So here's where I'm at:

1) The wall & closet between the kitchen and what I'm making into a dining room has been torn down thanks to dad. You can see the wall behind the custom build shelf unit between the kitchen and living room (this shelf will be coming down in the near future too). I was surprised to find dry wall under the paneling - why would you put up that green paneling?? Anyway, that's the wall that was removed as you'll see the progress in the next two pics.

As you can see above the wall is GONE!!

2.) The walls in the old bedroom (that you can see in the picture above have wallpaper on them - no big deal, right? Wrong, after who knows how many hours and use of a professional steamer......I knocked down one of the walls! It will be so much cheaper and easier to just put up new sheet rock. Why I wasted so many hours trying to remove the 4 layers of old, old paper is beyond me. The back wall shown above now has a door cut out - part of this room will be the master bath and the other half will be the dining room. The window you see will eventually become a door leading onto a deck out back.

The hole in the wall is where the door was later cut out.

3.) My cabinets are almost completely painted. I've trimmed one side (didn't have enough to get the other side completely done). Once I get the other side trimmed, I'll paint the trim and then work on the back splash. My new drawer pulls came in Saturday, so installing them and putting the cabinets 'back together' will complete that part of the remodel. Below is a pic before the trim.

.....and here it is with the trim on it and the top cubby hole with a coat of paint (several more will be required).

4.) I've determined that I really don't like the ceiling tiles currently in the house and have found that the entire house has the old slat ceiling. Pretty sure the tiles will be removed and the slats sanded and white washed. Can't wait to start on that - should be a huge improvement.

5.) My closet (which use to be a 1/2 bath and double closet between the two bedrooms) is down to 2x4's now. Still have to deal with the plumbing from the old bathroom and then we'll be able to start the dry wall! The before picture:and an in-process picture. The tiles, stool and sink are now gone (just don't have a picture).

Dad also took the top boards off the built in shelf between the living room and kitchen to make sure the post wasn't load-bearing and it's not!! So I'll be able to have that 12 foot area between the two rooms open.

I've decided that several of the things that I was going to wait and do once I moved in I'll probably go ahead and do now. Since everything's all tore up I might as well do it all at once instead of starting a project and leaving 1 or 2 things undone until a later date and then making a huge mess once furniture and my belongs are in place.

My move in goal is Halloween.....we'll see how it goes!

Left to do in the kitchen / dining room:
1.) Finish trim, finish painting cabinets and top cubby hole.
2.) Install hardware and re-hang doors
3.) Backsplash - faux silver tin
4.) Finish the removal of the custom built shelf between living room & kitchen
5.) Remove ceiling tiles, sand & white wash planks
6.) Remove carpet in kitchen
7.) Hope to remove floor tiles under kitchen carpet glued directly onto oak hardwood floors
8.) Frame and dry wall my bathroom (1/2 floor space of old bedroom/dining room area)
9.) Remove window and cut frame for patio door
10.) Cut frame for new back door (leading to mudroom/basement)
11.) Fill in old backdoor with dry wall
12.) Mud & sand all dry wall
13.) Paint
14.) Have floors sanded and refinished
15.) Install new floor and wall cabinets between stove & fridge
16.) Build/install kitchen island
17.) Hang new lighting in the kitchen & dining room
18.) Install all floor & ceiling trim
19.) Move in kitchen 'stuff'